This was the starting point with lots of black algae’s and loose mosaic tiles

The pool has been emptied of water and now all the mosaic tiles need to be removed for cleaning.

Now the grinding and preparations for new layers of impregnation begin

Renovation of the pool edge and where the water circulates back to the filtering system

After three layers of impregnation have been applied, the pool is ready to start laying new mosaic tiles.


The platforms between the poles have now been repaired to prevent water and moisture from entering and causing black algae

New mosaic is being installed on the pool walls and preparations for new lighting have been made
